1. Can you really deliver in 2–3 months?
Yes, with five conditions: mill order within 5 days, foundation done in parallel, permit package submitted day one, logistics pre-booked, site access confirmed. Without these, no.
2. Where does 30–50% cost saving come from?
Site labor (50–70% less), waste (<3% vs. 10–15%), weather contingency (<3% vs. 15–25%), and lighter logistics. Not cheaper materials – fewer site days.
3. What certifications matter for government/EU projects?
EN 1090-1 EC2 (EU mandatory), ASTM A1003 (US), AS/NZS 4600 (Australia), ISO 9001. For marine: DNV on request.
4. Have you delivered to remote locations with no local engineering?
Yes. Example: remote Pacific island, C5-M marine, typhoon zone. Containerized LGS + extra corrosion kit + digital passport. No local engineering required.
5. What’s in your proposal and how fast?
3–5 days. Includes: price per m², BOM, framing schedule, traceability plan, sealed structural summary, delivery schedule. No brochures.
6. What’s your material substitution policy?
No substitution without written buyer approval and updated traceability log. We maintain a pre-approved supplier registry. Write this into your contract.